Shenyang Shiji Weiye Steel Structure has been deeply engaged in steel‑structure projects for factories, workshops, and venues in Shenyang and the broader Liaoning–Shenyang region for many years. The company consistently upholds the highest standards of workplace safety, ensuring that both project timelines and construction quality are firmly grounded in rigorous safety management.
Steel structures are characterized by their light self-weight, large spans, and high assembly efficiency; however, the construction process involves numerous high‑risk operations, including overhead lifting, hot‑work welding, and the handling of heavy components. Coupled with the Liaoshen region’s climatic conditions—frequent winds in spring and autumn, abundant rainfall in summer, and low temperatures accompanied by snowfall in winter—on‑site safety management presents significant challenges. Occupational safety must be integrated across the entire project lifecycle, from component fabrication and transportation to lifting and hoisting, on‑site installation, and subsequent plant‑facility operation and maintenance. The following summarizes the key construction safety risks and standardized control requirements for reference by frontline workers and partner clients.
I. In light of the local construction environment, identify and categorize four major types of safety risks.
(1) Risks of Working at Heights
Steel structure installation is predominantly carried out in suspended conditions; during the erection of steel beams and columns, no fixed working platforms are available, and edge‑exposed and roof‑level operations are frequent. In accordance with local construction management regulations: In winds of Force 6 or higher, heavy rain, or dense fog, all high-altitude lifting and work at height must be completely suspended. . Common on-site violations: Seat belts are installed too low and used at a high position, or have not been installed at all. Safety Lifeline , stepping on unsecured steel beams and throwing tools and materials from height , which can easily result in falls and injuries. 
(II) Lifting and Hoisting Risks
Project H-beam Z‑section steel purlins and large steel frame members have substantial self‑weights; foundation settlement beneath crane outriggers, wire rope wear and strand breakage, overloading during lifting operations, and disorganized, overlapping command by multiple workers are all common causes of accidents on construction sites. Lifting operations must be strictly adhered to on site. “The Ten No-Lifts” Management regulations, A barrier and warning line shall be set up in the lifting operation area, and personnel are prohibited from passing under or lingering beneath suspended loads. 。
(3) Risks Associated with Welding and Hot Work, as well as Temporary Electrical Use
Both component fabrication and on-site assembly require welding and gas‑cutting operations; during the local rainy season, high air humidity significantly increases the risks of cable immersion and equipment leakage. Work execution standards: Oxygen cylinders and acetylene cylinders shall be stored at least 5 meters apart and at least 10 meters away from open flames. ; Ensure that welding equipment is properly grounded and that dry powder fire extinguishers are available on site; After completion of hot work, designate a dedicated person to provide on-site supervision for 30 minutes. , eliminate fire hazards.
(4) Long-term Safety Risks of Structural Joints
The overall stability of steel structures relies on various types of connection nodes. Insufficient tightening of high-strength bolts, porosity and cracks in welds, premature removal of temporary supports, and damage and corrosion of the anti-corrosion coating. , There are no obvious abnormalities in the short term; however, long-term use may lead to deformation of the factory building and a reduction in structural load-bearing capacity. All engineering projects undertaken by our company adhere to a unified set of control standards: First-class weld seam All nondestructive testing has been completed, and all high-strength bolts have undergone final torque verification. , thereby mitigating inherent structural quality risks at the source of production.
II. End-to-End Standardized Safety Management Measures (Closed-Loop Management of Fabrication and Installation)
As a domestic steel‑structure manufacturing and construction enterprise, the company ensures that safety responsibilities are assigned to every process and every employee, standardizing on‑site work practices within its teams while delivering steel‑structure industrial buildings that meet safety standards and offer long service life to its clients.
(1) Safety Management for Component Fabrication in the Factory Area
Personnel Management
Welders, crane operators, and cutting workers all hold the required certifications and are employed in accordance with regulations; pre-shift safety briefings are conducted monthly, and special safety briefings are provided for winter operations conducted in low-temperature conditions. Individuals with hypertension or a fear of heights shall not be assigned to work involving climbing or operating heavy machinery. 。
Material Stacking
: Steel components are elevated 200 mm at the base and stacked by section, Stack no more than three layers high and install lateral bracing to prevent components from toppling or sliding and causing injury. 。
Device Management
: Conduct a comprehensive pre‑start inspection of vehicles, cutting machines, and rust‑removal and coating equipment each day. Equipment exhibiting faults such as electrical leakage or component damage must be immediately shut down for repair; operation with known faults is strictly prohibited. 。
(II) Safety Management for Installation at the Construction Site
Implement the three-level safety technical briefing. Prior to the commencement of the project, the technical manager, safety officer, and construction crews conducted tiered safety briefings, identifying risk locations in light of Shenyang’s local weather conditions and site-specific factors. Work shall not commence until all handover procedures have been completed, and all handover documentation shall be systematically filed and retained. 。
Standardize the use of personal protective equipment. All personnel entering the site must wear safety helmets and non-slip safety shoes; for work at height, double‑hook safety harnesses must be used. Strictly enforce the requirement of high hanging and low use. ; Safety lifelines are installed continuously across the entire roof surface, Personnel are prohibited from walking on unfinished fixed steel beams. 。
Standardized Control of Lifting Operations Crane outrigger placement Steel plate subgrade box , to prevent settlement of the soft soil foundation in Shenyang; prior to lifting, conduct a trial lift to verify component balance, with unified command provided by a certified signalman; after steel column installation is complete, install guy wires on all four sides for reinforcement. The hook may be released and the temporary supports removed only after the structure has achieved stability. 。
Special Flood Control and Management Plan for the Rainy Season At the construction site, drainage channels were cleared in advance, and flood‑control sandbags were stockpiled in low‑lying areas. Following rainfall and prior to resuming work, a thorough inspection was conducted to assess foundation bearing capacity, the degree of corrosion on structural components, and the stability of crane foundations. Prevent collapse accidents caused by standing water and foundation settlement. 。
(3) Post‑Delivery Operation and Maintenance Safety Advisory (For Partner Clients)
The completion of a factory building does not mark the end of safety management; routine maintenance directly determines the service life of the steel structure.
Regularly inspect roof purlins, beam–column connection bolts, and weld locations. Promptly reapply anti-corrosion coating to areas where the coating has peeled off. ; In Northeast China, de-icing salts used during winter can accelerate steel corrosion, necessitating thorough inspections and protective measures.
The internal storage of goods in the factory building must not exceed the design load capacity, and the unauthorized installation of heavy equipment or the construction of mezzanine floors is prohibited.
; If structural modifications are required, please contact our company for a tailored reinforcement plan.
Install additional protective devices around roof-mounted fans and skylights. Personnel performing maintenance on the roof must be equipped with a complete set of fall protection gear; roofing work is prohibited during high-wind conditions. 。
III. Basic Principles of Enterprise Safety Management
For more than a decade, the company has been deeply rooted in Shenyang’s steel‑structure industry, witnessing numerous safety incidents caused by streamlined procedures and non‑compliant operations. These incidents have resulted in injuries to construction workers and project shutdowns, while also imposing schedule delays and financial losses on our partner clients. In response, the company has consistently upheld three core principles of safety management:
Do not compromise safety for the sake of progress.
When the construction schedule is tight, work must be suspended and corrective measures implemented in the event of inclement weather or inadequate on-site safety precautions.
Do not cut safety spending to reduce costs.
: Ensure full allocation of national‑standard personal protective equipment, weld‑joint nondestructive testing, temporary supports, and anti‑corrosion materials, and strictly prohibit any cutting corners or material substitution.
All employees have a safety veto right.
: On-site workers and management personnel who identify unauthorized instructions or significant safety hazards may immediately halt operations, and the enterprise shall not hold them accountable.
Ensuring workplace safety safeguards the lives and health of frontline construction workers, upholds our commitment to providing long-term, reliable service to our partners, and serves as the cornerstone of Shenyang Shiji Weiye Steel Structure’s foothold in the Liaoning–Shenyang market.
Conclusion
Steel frames bear the structural load, safeguarding the company’s original mission. Moving forward, Shenyang Century Weiye Steel Structure will continue to refine its end-to-end safety management system, delivering safe, robust, and durable steel‑structure buildings for factories, warehouses, and industrial parks across Shenyang. For new construction, expansion, reinforcement, or renovation projects, we invite clients from all sectors to visit our facility and inspect our standardized component fabrication processes as well as our model projects showcasing safe and environmentally responsible construction practices.